Inactive
Notice ID:75N99025R00007
The purpose of this contract is to obtain onsite engineering and technical maintenance support for the installed ABB Distributed Control System (DCS) the Harmony Infi-90 System, which contains Bridge ...
The purpose of this contract is to obtain onsite engineering and technical maintenance support for the installed ABB Distributed Control System (DCS) the Harmony Infi-90 System, which contains Bridge Rack Controllers (BRC) and associated system hardware that communicates/controls the equipment producing and distributing the CHW and HTHW throughout the campus