BLDG 31B New Roofing Below Grade Structure
This opportunity involves a construction project to stop water infiltration by installing new roofing, waterproofing, and drainage systems. The performance location is not specified in the provided text. A mandatory site visit is required for vendors who did not attend the first one, with a request deadline of 15 May. The proposal due date is 16 June 2026 at 5:00 PM, and RFI answers will be posted by 9 June 2026. No budget amount is specified, and the evaluation will use the lowest price technically acceptable (LPTA) method.