BLDG 31B New Roofing Below Grade Structure
75N98026R00067
This opportunity involves implementing a long-term solution to stop water infiltration by removing and replacing roofing, waterproofing, and drainage systems. A site visit is scheduled for May 6 at 2:00 PM, with attendance confirmation due by May 4. Requests for Information (RFI) are due by May 8. The proposal must include technical approach, pricing, and past performance, and will be evaluated using the lowest price technically acceptable (LPTA) method. The location for performance is not specified in the description.