Rosebud Lift Station Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75H70126R00030

This project involves the full removal and replacement of the existing lift station at 1319 Soldier Creek Road in Rosebud, SD, to accommodate hospital and tribal program expansion. The performance period is 240 calendar days, with a construction budget between $500,000 and $1,000,000 under a firm-fixed-price contract. The new lift station will include a wet well, dry well, chopper pumps, a force main connection, and a new control system for monitoring flow and equipment status. The existing wet well, dry well, pumps, and piping will be demolished after the new system is operational. TERO requirements apply, and brand names referenced establish a standard of quality for which equal products may be proposed.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF INDIAN HEALTH SERVICE DIV OF ENGINEERING SVCS - SEATTLE
  PSC   Y1ND CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
LOCATION: Not Given
Primary Contact
Daniel Cotto
240-***-7841
Alt Contact
Andrew E. Hart
206-***-4443

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »