Rosebud Lift Station Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75H70126R00030

This opportunity involves the full removal and replacement of an existing lift station at 1319 Soldier Creek Road, Rosebud, SD, to accommodate hospital and tribal program expansion. The project includes a new wet well, dry well, chopper pumps, force main connection, and a control system, with a performance period of 240 calendar days. The construction magnitude is between $500,000 and $1,000,000, under a firm-fixed-price contract, and is a total small business set-aside. TERO requirements apply, and brand names establish a standard of quality, with equal products allowed if they meet specified performance requirements. The existing lift station will be demolished after the new one is operational, sized for future growth.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF INDIAN HEALTH SERVICE DIV OF ENGINEERING SVCS - SEATTLE
  PSC   Y1ND CONSTRUCTION OF SEWAGE AND WASTE FACILITIES


Data sourced from SAM.gov. View Official Posting »

Rosebud Lift Station Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75H70126R00030

This opportunity involves the full removal and replacement of an existing lift station at 1319 Soldier Creek Road, Rosebud, SD 57570, with a new system designed to handle increased capacity and future expansion. The project is a total small business set-aside with a firm-fixed-price contract, and the construction magnitude is between $500,000 and $1,000,000. Performance is required within 240 calendar days, and the work includes installing chopper pumps, a new control system, and a force main connection. Key pump requirements have been updated, including a capacity of 125 GPM and a total dynamic head of 80 feet. Brand names are referenced as a standard, but offerors may propose equal products that meet or exceed the specified requirements.

Rosebud Lift Station Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75H70126R00030

This opportunity involves the full removal and replacement of an existing lift station at 1319 Soldier Creek Road, Rosebud, SD 57570, to increase capacity and accommodate future expansion. The project is a total small business set-aside with a firm-fixed-price contract, and the construction magnitude is between $500,000 and $1,000,000. The performance period is 240 calendar days, and TERO requirements apply. The new lift station will include a wet well, dry well, chopper pumps, force main connection, and a new control system, with the existing station to be demolished. Brand names are referenced as a standard, but offerors may propose equal products that meet or exceed the specified requirements.

Rosebud Lift Station Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75H70126R00030

This is a total small business set-aside solicitation for the construction of a new sewage lift station at 1319 Soldier Creek Road, Rosebud, SD 57570. The project requires full removal and replacement of the existing lift station, including a new wet well, dry well, chopper pumps, force main connection, and a control system. The performance period is 240 calendar days, with a construction magnitude between $500,000 and $1,000,000 under a firm-fixed-price contract. The new station must be sized to handle future expansion and will serve the hospital, quarters units, and tribal program buildings. TERO requirements are applicable as specified in Section H.50.

Rosebud Lift Station Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75H70126R00030

This project involves the full removal and replacement of the existing lift station at 1319 Soldier Creek Road in Rosebud, SD, to accommodate hospital and tribal program expansion. The performance period is 240 calendar days, with a construction budget between $500,000 and $1,000,000 under a firm-fixed-price contract. The new lift station will include a wet well, dry well, chopper pumps, a force main connection, and a new control system for monitoring flow and equipment status. The existing wet well, dry well, pumps, and piping will be demolished after the new system is operational. TERO requirements apply, and brand names referenced establish a standard of quality for which equal products may be proposed.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF INDIAN HEALTH SERVICE DIV OF ENGINEERING SVCS - SEATTLE
  PSC   Y1ND CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
LOCATION: Not Given
Primary Contact
Daniel Cotto
240-***-7841
Alt Contact
Andrew E. Hart
206-***-4443

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »