Level 2 FRP Over Lab Ceilings Installation- COFC0401

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:75D301-26-R-73423

The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls with fiberglass reinforced polymer (FRP) panels in laboratory and support spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The contractor is responsible for all materials, labor, and supervision, including demolition, surface preparation, installation, and coordination with CDC for phased access. Work must be completed within 180 days after Notice to Proceed, and offerors must demonstrate at least three years of experience with similar projects. A site visit is scheduled for April 13, 2026, at 0930 (MT). No budget amount is specified.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF CENTERS FOR DISEASE CONTROL AND PREVENTION CDC OFFICE OF ACQUISITION SERVICES
  PSC   Z1DB MAINTENANCE OF LABORATORIES AND CLINICS


Data sourced from SAM.gov. View Official Posting »

Level 2 FRP Over Lab Ceilings Installation- COFC0401

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:75D301-26-R-73423

The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The contractor must install smooth, white fiberglass reinforced polymer (FRP) panels and trim, including demolition, surface preparation, and coordination with CDC for phased access. Work must comply with all health, safety, and environmental regulations, with temporary barriers and dust control to minimize disruption to CDC operations. Completion is required within 180 days after Notice to Proceed, and offerors must demonstrate at least three years of experience with similar projects. A site visit is scheduled for April 13, 2026, at 0930 (MT).

Level 2 FRP Over Lab Ceilings Installation- COFC0401

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:75D301-26-R-73423

The Centers for Disease Control and Prevention requires a contractor to repair and refinish gypsum board ceilings and walls with fiberglass reinforced polymer panels in specified areas of Building 401 at its Ft. Collins campus. The contractor must provide all materials, labor, and supervision for the complete scope of work, including demolition, installation, and necessary protections to minimize operational disruption. All work must be completed within 180 days after the Notice to Proceed. Offerors must demonstrate at least three years of relevant experience with similar construction and interior finish projects. A site visit is scheduled for April 13, 2026.

Level 2 FRP Over Lab Ceilings Installation- COFC0401

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:75D301-26-R-73423

The CDC requires a contractor to repair and refinish gypsum board ceilings and walls with FRP panels in specific areas of Building 401 at its Ft. Collins campus. The work includes demolition, installation, sealing, and coordination for phased access. All work must be completed within 180 days after the Notice to Proceed. The contractor must provide all materials, labor, and supervision while complying with health, safety, and environmental regulations. Offerors must have at least three years of experience with similar construction and interior finish projects.