P2025-1016601, Furniture Install Sit Stands, Chamblee, GA

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:75D301-26-Q-79184

The acquisition seeks a turn-key FF&E solution to convert existing Allsteel workstation cubicles into CDC-approved electric sit-stand workstations with specified accessories, while maintaining operational continuity. The work includes providing a desk top electric programmable height adjustment controller, horizontal and vertical cable managers, a 16-foot surge protector extension cord, and a desk top power monument. New worksurfaces may be provided only if existing ones cannot be reused. Performance location is Building 106, Floors 3–7. No timelines or budget amounts are specified.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF CENTERS FOR DISEASE CONTROL AND PREVENTION CDC OFFICE OF ACQUISITION SERVICES
  PSC   OFFICE FURNITURE
LOCATION: Not Given
Primary Contact
Aleesha Butler
770-***-5245

Links (0)

Attachments (34)

Document
Size
Access
Updated
B3 RFI Worksheet v3 (8.13.26).docx
42.8 KB
Public
Aug 13, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v4.pdf
785.97 KB
Public
Aug 13, 2026
Artificial Intelligence Compliance and Risk Management Plan.docx
25.5 KB
Public
Aug 4, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v3.pdf (deleted on Aug 13, 2026)
841.97 KB
Public
Aug 6, 2026
A1b Typical Totals.xlsx
62.46 KB
Public
Aug 10, 2026
B3 RFI Worksheet v2 (8.6.26).docx (deleted on Aug 13, 2026)
31.84 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v2.pdf (deleted on Aug 13, 2026)
756.66 KB
Public
Aug 6, 2026
B3 RFI Worksheet (8.6.26).docx (deleted on Aug 13, 2026)
31.68 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL A (8.6.26).pdf
364.02 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL B (8.6.26).pdf
355.37 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL C (8.6.26).pdf
356.25 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL D (8.6.26).pdf
352.54 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL E (8.6.26).pdf
350 KB
Public
Aug 6, 2026
A1b GACH0106_Flr7_SitStand_TYPICAL F (8.6.26).pdf
200.6 KB
Public
Aug 6, 2026
A1b GACH0106_0003 (8.6.26).pdf
558.9 KB
Public
Aug 6, 2026
A1b GACH0106_0004 (8.6.26).pdf
501.78 KB
Public
Aug 6, 2026
A1b GACH0106_0005 (2.05.26).pdf
503.32 KB
Public
Aug 6, 2026
A1b GACH0106_0006 (8.6.26).pdf
480.44 KB
Public
Aug 6, 2026
A1b GACH0106_0007 (8.6.26).pdf
482.39 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184.pdf (deleted on Aug 13, 2026)
653.89 KB
Public
Aug 4, 2026
B3 RFI Worksheet.docx (deleted on Aug 13, 2026)
30.15 KB
Public
Aug 4, 2026
A1b SPECIFICATIONS 2.27.24.pdf (deleted on Aug 13, 2026)
143.65 KB
Public
Aug 4, 2026
A1b ATTACHMENT B (4TH FL DRAWINGS) 2.27.24.pdf (deleted on Aug 13, 2026)
2.66 MB
Public
Aug 4, 2026
A1b ATTACHMENT B (5TH FL DRAWINGS) 2.27.24.pdf (deleted on Aug 13, 2026)
2.62 MB
Public
Aug 4, 2026
A1b ATTACHMENT D (4TH FL Labor Specs) 2.27.24.pdf (deleted on Aug 13, 2026)
54.15 KB
Public
Aug 4, 2026
A1b ATTACHMENT D (5TH FL Labor Specs) 2.27.24.pdf (deleted on Aug 13, 2026)
44.98 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL A.pdf (deleted on Aug 13, 2026)
364.02 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL B.pdf (deleted on Aug 13, 2026)
355.37 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL C.pdf (deleted on Aug 13, 2026)
356.25 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL D.pdf (deleted on Aug 13, 2026)
352.54 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL E.pdf (deleted on Aug 13, 2026)
350 KB
Public
Aug 4, 2026
A1b Flr7 TYPICAL F.pdf (deleted on Aug 13, 2026)
200.6 KB
Public
Aug 4, 2026
A1b Chamblee B106 SS Per Floor.docx
17.82 KB
Public
Aug 4, 2026
A1b Chamblee Bldg 106 SS required per floor.docx
17.94 KB
Public
Aug 4, 2026


Data sourced from SAM.gov. View Official Posting »

P2025-1016601, Furniture Install Sit Stands, Chamblee, GA

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75D301-26-Q-79184

This acquisition provides a turn-key FF&E solution to convert existing Allsteel workstation cubicles into CDC-approved electric sit-stand workstations with specified accessories. The work includes desk top electric programmable height adjustment controllers, horizontal and vertical cable managers, a surge protector extension cord, and a desk top power monument. Matching new worksurfaces are only required if existing worksurfaces cannot be reused. Operational continuity must be maintained throughout the conversion. Performance location is Building 106, Floors 3–7.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF CENTERS FOR DISEASE CONTROL AND PREVENTION CDC OFFICE OF ACQUISITION SERVICES
  PSC   7110 OFFICE FURNITURE
LOCATION: Not Given
Primary Contact
Aleesha Butler
770-***-5245

Links (0)

Attachments (32)

Document
Size
Access
Updated
A1b Typical Totals.xlsx
62.46 KB
Public
Aug 10, 2026
B3 RFI Worksheet v2 (8.6.26).docx
31.84 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v3.pdf
841.97 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v2.pdf
756.66 KB
Public
Aug 6, 2026
B3 RFI Worksheet (8.6.26).docx
31.68 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL A (8.6.26).pdf
364.02 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL D (8.6.26).pdf
352.54 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL E (8.6.26).pdf
350 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL C (8.6.26).pdf
356.25 KB
Public
Aug 6, 2026
A1b GACH0106_0007 (8.6.26).pdf
482.39 KB
Public
Aug 6, 2026
A1b GACH0106_0003 (8.6.26).pdf
558.9 KB
Public
Aug 6, 2026
A1b GACH0106_0005 (2.05.26).pdf
503.32 KB
Public
Aug 6, 2026
A1b GACH0106_Flr7_SitStand_TYPICAL F (8.6.26).pdf
200.6 KB
Public
Aug 6, 2026
A1b GACH0106_0006 (8.6.26).pdf
480.44 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL B (8.6.26).pdf
355.37 KB
Public
Aug 6, 2026
A1b GACH0106_0004 (8.6.26).pdf
501.78 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184.pdf
653.89 KB
Public
Aug 4, 2026
Artificial Intelligence Compliance and Risk Management Plan.docx
25.5 KB
Public
Aug 4, 2026
B3 RFI Worksheet.docx
30.15 KB
Public
Aug 4, 2026
A1b SPECIFICATIONS 2.27.24.pdf
143.65 KB
Public
Aug 4, 2026
A1b ATTACHMENT B (4TH FL DRAWINGS) 2.27.24.pdf
2.66 MB
Public
Aug 4, 2026
A1b ATTACHMENT B (5TH FL DRAWINGS) 2.27.24.pdf
2.62 MB
Public
Aug 4, 2026
A1b ATTACHMENT D (4TH FL Labor Specs) 2.27.24.pdf
54.15 KB
Public
Aug 4, 2026
A1b ATTACHMENT D (5TH FL Labor Specs) 2.27.24.pdf
44.98 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL A.pdf
364.02 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL B.pdf
355.37 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL C.pdf
356.25 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL D.pdf
352.54 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL E.pdf
350 KB
Public
Aug 4, 2026
A1b Flr7 TYPICAL F.pdf
200.6 KB
Public
Aug 4, 2026
A1b Chamblee B106 SS Per Floor.docx
17.82 KB
Public
Aug 4, 2026
A1b Chamblee Bldg 106 SS required per floor.docx
17.94 KB
Public
Aug 4, 2026


Data sourced from SAM.gov. View Official Posting »

P2025-1016601, Furniture Install Sit Stands, Chamblee, GA

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75D301-26-Q-79184

The contractor will provide a turn-key furniture, fixtures, and equipment (FF&E) solution to convert existing Allsteel workstation cubicles into CDC-approved electric sit-stand workstations. This work will occur in Building 106, Floors 3 through 7. The solution includes accessories such as height adjustment controllers, cable managers, a surge protector extension cord, and a desk power monument. New worksurfaces are only required if existing ones cannot be reused. The conversion must maintain operational continuity throughout the effort.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF CENTERS FOR DISEASE CONTROL AND PREVENTION CDC OFFICE OF ACQUISITION SERVICES
  PSC   7110 OFFICE FURNITURE
LOCATION: Not Given
Primary Contact
Aleesha Butler
770-***-5245

Links (0)

Attachments (29)

Document
Size
Access
Updated
A19 SF18 RFQ 75D301-26-Q-79184 v2.pdf
756.66 KB
Public
Aug 6, 2026
B3 RFI Worksheet (8.6.26).docx
31.68 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL A (8.6.26).pdf
364.02 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL D (8.6.26).pdf
352.54 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL E (8.6.26).pdf
350 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL C (8.6.26).pdf
356.25 KB
Public
Aug 6, 2026
A1b GACH0106_0003 (8.6.26).pdf
558.9 KB
Public
Aug 6, 2026
A1b GACH0106_0007 (8.6.26).pdf
482.39 KB
Public
Aug 6, 2026
A1b GACH0106_0005 (2.05.26).pdf
503.32 KB
Public
Aug 6, 2026
A1b GACH0106_Flr7_SitStand_TYPICAL F (8.6.26).pdf
200.6 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL B (8.6.26).pdf
355.37 KB
Public
Aug 6, 2026
A1b GACH0106_0006 (8.6.26).pdf
480.44 KB
Public
Aug 6, 2026
A1b GACH0106_0004 (8.6.26).pdf
501.78 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184.pdf
653.89 KB
Public
Aug 4, 2026
Artificial Intelligence Compliance and Risk Management Plan.docx
25.5 KB
Public
Aug 4, 2026
B3 RFI Worksheet.docx
30.15 KB
Public
Aug 4, 2026
A1b SPECIFICATIONS 2.27.24.pdf
143.65 KB
Public
Aug 4, 2026
A1b ATTACHMENT B (4TH FL DRAWINGS) 2.27.24.pdf
2.66 MB
Public
Aug 4, 2026
A1b ATTACHMENT B (5TH FL DRAWINGS) 2.27.24.pdf
2.62 MB
Public
Aug 4, 2026
A1b ATTACHMENT D (4TH FL Labor Specs) 2.27.24.pdf
54.15 KB
Public
Aug 4, 2026
A1b ATTACHMENT D (5TH FL Labor Specs) 2.27.24.pdf
44.98 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL A.pdf
364.02 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL B.pdf
355.37 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL C.pdf
356.25 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL D.pdf
352.54 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL E.pdf
350 KB
Public
Aug 4, 2026
A1b Flr7 TYPICAL F.pdf
200.6 KB
Public
Aug 4, 2026
A1b Chamblee B106 SS Per Floor.docx
17.82 KB
Public
Aug 4, 2026
A1b Chamblee Bldg 106 SS required per floor.docx
17.94 KB
Public
Aug 4, 2026


Data sourced from SAM.gov. View Official Posting »

P2025-1016601, Furniture Install Sit Stands, Chamblee, GA

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75D301-26-Q-79184

The contractor will provide a turn-key furniture, fixtures, and equipment (FF&E) solution to convert existing Allsteel workstation cubicles on Floors 3–7 of Building 106 into CDC-approved electric sit-stand workstations. The work includes installing accessories such as programmable height adjustment controllers, cable managers, a surge protector extension cord, and a desk power monument. Operational continuity must be maintained during the conversion. New matching worksurfaces are only required if existing ones cannot be reused. Performance location is Building 106, Floors 3–7.

Department/Ind.Agency Subtier Office
HEALTH AND HUMAN SERVICES, DEPARTMENT OF CENTERS FOR DISEASE CONTROL AND PREVENTION CDC OFFICE OF ACQUISITION SERVICES
  PSC   7110 OFFICE FURNITURE
LOCATION: Not Given
Primary Contact
Aleesha Butler
770-***-5245

Links (0)

Attachments (31)

Document
Size
Access
Updated
B3 RFI Worksheet v2 (8.6.26).docx
31.84 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v3.pdf
841.97 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184 v2.pdf
756.66 KB
Public
Aug 6, 2026
B3 RFI Worksheet (8.6.26).docx
31.68 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL A (8.6.26).pdf
364.02 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL D (8.6.26).pdf
352.54 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL E (8.6.26).pdf
350 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL C (8.6.26).pdf
356.25 KB
Public
Aug 6, 2026
A1b GACH0106_0003 (8.6.26).pdf
558.9 KB
Public
Aug 6, 2026
A1b GACH0106_0007 (8.6.26).pdf
482.39 KB
Public
Aug 6, 2026
A1b GACH0106_0005 (2.05.26).pdf
503.32 KB
Public
Aug 6, 2026
A1b GACH0106_Flr7_SitStand_TYPICAL F (8.6.26).pdf
200.6 KB
Public
Aug 6, 2026
A1b GACH0106_Flr6_SitStand_TYPICAL B (8.6.26).pdf
355.37 KB
Public
Aug 6, 2026
A1b GACH0106_0006 (8.6.26).pdf
480.44 KB
Public
Aug 6, 2026
A1b GACH0106_0004 (8.6.26).pdf
501.78 KB
Public
Aug 6, 2026
A19 SF18 RFQ 75D301-26-Q-79184.pdf
653.89 KB
Public
Aug 4, 2026
Artificial Intelligence Compliance and Risk Management Plan.docx
25.5 KB
Public
Aug 4, 2026
B3 RFI Worksheet.docx
30.15 KB
Public
Aug 4, 2026
A1b SPECIFICATIONS 2.27.24.pdf
143.65 KB
Public
Aug 4, 2026
A1b ATTACHMENT B (4TH FL DRAWINGS) 2.27.24.pdf
2.66 MB
Public
Aug 4, 2026
A1b ATTACHMENT B (5TH FL DRAWINGS) 2.27.24.pdf
2.62 MB
Public
Aug 4, 2026
A1b ATTACHMENT D (4TH FL Labor Specs) 2.27.24.pdf
54.15 KB
Public
Aug 4, 2026
A1b ATTACHMENT D (5TH FL Labor Specs) 2.27.24.pdf
44.98 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL A.pdf
364.02 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL B.pdf
355.37 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL C.pdf
356.25 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL D.pdf
352.54 KB
Public
Aug 4, 2026
A1b Flr6 TYPICAL E.pdf
350 KB
Public
Aug 4, 2026
A1b Flr7 TYPICAL F.pdf
200.6 KB
Public
Aug 4, 2026
A1b Chamblee B106 SS Per Floor.docx
17.82 KB
Public
Aug 4, 2026
A1b Chamblee Bldg 106 SS required per floor.docx
17.94 KB
Public
Aug 4, 2026


Data sourced from SAM.gov. View Official Posting »

P2025-1016601, Furniture Install Sit Stands, Chamblee, GA

Total Small Business Set-Aside (FAR 19.5)
Notice ID:75D301-26-Q-79184

The acquisition seeks a turn-key FF&E solution to convert existing Allsteel workstation cubicles into CDC-approved electric sit-stand workstations with specified accessories, while maintaining operational continuity. The work will take place in Building 106, Floors 3–7. The solution includes providing desk top electric height adjustment controllers, cable managers, a surge protector extension cord, and a desk top power monument. New matching worksurfaces may be provided only if existing ones cannot be reused. No budget or timeline details are specified.