SLAC CUIR SP1 Master Substation Annex Building Construction

Notice ID:SLAC_RFP_368509

This Sources Sought Notice seeks general contractors for the CUIR Subproject 1 Master Substation Annex Building at SLAC National Accelerator Laboratory, with work in the Master Substation Yard adjacent to Building B016. Planned scope includes constructing Building B017S, installing SLAC-furnished medium-voltage switchgear, relocating a generator, replacing a substation, installing busways, and reconnecting 12kV cables while keeping B016 operational and minimizing service interruptions. The estimated cost range is $12M to $17M, and SLAC plans a Best Value Trade Off selection for a design-build subcontractor. A draft RFP is provided for context, but this is not a solicitation, no award will be made from this notice, and SLAC intends to issue a formal solicitation later. Interested vendors should express interest through the SAM.gov Interested Vendors List or by emailing the procurement specialist and provide company contact information, bonding capacity, and a statement of interest and capability.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF SLAC Natl Accel Lab -DOE Contractor
  PSC   (blank)
LOCATION: Not Given
Primary Contact
Quyen Weng
Not Given

Links (0)

Attachments (38)

Document
Size
Access
Updated
DRAFT_B2_00_Cover_Letter.pdf
687.7 KB
Public
Oct 19, 2026
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf
630.33 KB
Public
Oct 19, 2026
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf
538.26 KB
Public
Oct 19, 2026
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf
593.22 KB
Public
Oct 19, 2026
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf
1.17 MB
Public
Oct 19, 2026
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf
35.94 MB
Public
Oct 19, 2026
DRAFT_B2_03.03_Commissioning_Plan.pdf
1.04 MB
Public
Oct 19, 2026
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf
2.14 MB
Public
Oct 19, 2026
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf
1.28 MB
Public
Oct 19, 2026
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf
744.72 KB
Public
Oct 19, 2026
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf
694.37 KB
Public
Oct 19, 2026
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf
3.62 MB
Public
Oct 19, 2026
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf
3.22 MB
Public
Oct 19, 2026
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf
13.01 MB
Public
Oct 19, 2026
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf
31.48 MB
Public
Oct 19, 2026
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf
950.36 KB
Public
Oct 19, 2026
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf
555.34 KB
Public
Oct 19, 2026
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf
579.13 KB
Public
Oct 19, 2026
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf
604.24 KB
Public
Oct 19, 2026
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf
623.92 KB
Public
Oct 19, 2026
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf
920.36 KB
Public
Oct 19, 2026
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf
607.47 KB
Public
Oct 19, 2026
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf
590.1 KB
Public
Oct 19, 2026
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf
596.36 KB
Public
Oct 19, 2026
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf
886.79 KB
Public
Oct 19, 2026
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf
718.45 KB
Public
Oct 19, 2026
DRAFT_B2_08.3_SF1413.pdf
638.13 KB
Public
Oct 19, 2026
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf
734.21 KB
Public
Oct 19, 2026
DRAFT_B2_08.5_SubcontractorFormSQF.pdf
776.04 KB
Public
Oct 19, 2026
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf
962.55 KB
Public
Oct 19, 2026
DRAFT_B2_08.7_Final_Inspection_Report.pdf
590.29 KB
Public
Oct 19, 2026
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf
607.62 KB
Public
Oct 19, 2026
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf
620.35 KB
Public
Oct 19, 2026
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf
536.87 KB
Public
Oct 19, 2026
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf
782.77 KB
Public
Oct 19, 2026
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf
609.52 KB
Public
Oct 19, 2026
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf
552.14 KB
Public
Oct 19, 2026
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf
796.4 KB
Public
Oct 19, 2026


Data sourced from SAM.gov. View Official Posting »

SLAC CUIR SP1 Master Substation Annex Building Construction

Notice ID:SLAC_RFP_368509

SLAC is conducting a sources-sought effort, not a solicitation, to identify general contractors capable of construction under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project; no award will result from this posting. The work will occur in the SLAC Master Substation Yard adjacent to Building B016 at SLAC National Accelerator Laboratory and includes construction of the new Master Substation Building (B017S). Scope also includes installing SLAC-provided medium-voltage switchgear, relocating an existing generator, replacing an existing substation, installing new busways, and reconnecting 12kV cables while keeping Building B016 operational and minimizing service interruptions. SLAC plans to use a Best Value Trade Off selection method for a design-build subcontractor and intends to issue a formal solicitation later based on responses. Interested contractors should express interest through the SAM.gov Interested Vendors List or by email and provide company contact information, bonding capacity, and a statement of interest; the draft RFP is provided for context and is subject to change.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF SLAC Natl Accel Lab -DOE Contractor
  PSC   (blank)
LOCATION: Not Given
Primary Contact
Quyen Weng
Not Given

Links (0)

Attachments (38)

Document
Size
Access
Updated
DRAFT_B2_00_Cover_Letter.pdf
687.7 KB
Public
Oct 19, 2026
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf
630.33 KB
Public
Oct 19, 2026
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf
538.26 KB
Public
Oct 19, 2026
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf
593.22 KB
Public
Oct 19, 2026
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf
1.17 MB
Public
Oct 19, 2026
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf
35.94 MB
Public
Oct 19, 2026
DRAFT_B2_03.03_Commissioning_Plan.pdf
1.04 MB
Public
Oct 19, 2026
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf
2.14 MB
Public
Oct 19, 2026
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf
1.28 MB
Public
Oct 19, 2026
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf
744.72 KB
Public
Oct 19, 2026
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf
694.37 KB
Public
Oct 19, 2026
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf
3.62 MB
Public
Oct 19, 2026
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf
3.22 MB
Public
Oct 19, 2026
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf
13.01 MB
Public
Oct 19, 2026
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf
31.48 MB
Public
Oct 19, 2026
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf
950.36 KB
Public
Oct 19, 2026
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf
555.34 KB
Public
Oct 19, 2026
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf
579.13 KB
Public
Oct 19, 2026
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf
604.24 KB
Public
Oct 19, 2026
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf
623.92 KB
Public
Oct 19, 2026
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf
920.36 KB
Public
Oct 19, 2026
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf
607.47 KB
Public
Oct 19, 2026
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf
590.1 KB
Public
Oct 19, 2026
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf
596.36 KB
Public
Oct 19, 2026
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf
886.79 KB
Public
Oct 19, 2026
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf
718.45 KB
Public
Oct 19, 2026
DRAFT_B2_08.3_SF1413.pdf
638.13 KB
Public
Oct 19, 2026
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf
734.21 KB
Public
Oct 19, 2026
DRAFT_B2_08.5_SubcontractorFormSQF.pdf
776.04 KB
Public
Oct 19, 2026
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf
962.55 KB
Public
Oct 19, 2026
DRAFT_B2_08.7_Final_Inspection_Report.pdf
590.29 KB
Public
Oct 19, 2026
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf
607.62 KB
Public
Oct 19, 2026
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf
620.35 KB
Public
Oct 19, 2026
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf
536.87 KB
Public
Oct 19, 2026
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf
782.77 KB
Public
Oct 19, 2026
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf
609.52 KB
Public
Oct 19, 2026
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf
552.14 KB
Public
Oct 19, 2026
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf
796.4 KB
Public
Oct 19, 2026


Data sourced from SAM.gov. View Official Posting »