RPC Power Factor Correction Work Package 1 - Demolition
This opportunity involves demolishing existing buildings and equipment at SLAC’s Master Substation to prepare for installing power factor correction systems. The work includes removing metal buildings B308 and B311, a synchronous condenser, and associated electrical infrastructure at the SLAC MSS Yard. The goal is to address power factor issues at the PG&E connection point to avoid penalties and improve system efficiency. No submission timelines or budget amounts are specified in this sources-sought notice. Performance of services will occur at the SLAC Master Substation location.