SLAC Sector 30 Erosion Mitigation Project
This is a Sources Sought Notice to identify qualified general contractors for construction work to mitigate soil erosion in Sector 30, not a solicitation for proposals. The project involves removing and replacing failed pavement, slope, earthwork, and storm drains, and installing permanent vegetation and erosion control measures on a 12- to 13-foot-tall hillside slope. Performance of services is at Sector 30, adjacent to sediment basin structure 30F-7. No budget amount is specified. Responses are due by 5 pm PST on June 18, 2026.
Links (0)
Attachments (26)
Data sourced from SAM.gov.
View Official Posting »