SLAC LCLS-II-HE PCW Skid Upgrade Project

Inactive
Notice ID:SLAC_RFP_362602

This is a sources sought notice for a construction project at SLAC, not a request for proposals. The planned scope involves three main tasks: installing CO2 chiller infrastructure in Room 310, demolishing and relocating an existing PCW skid, and upgrading the B950 PCW system with a new skid and upsized piping. Performance of services requires the contractor to have an established local office in the San Francisco Bay Area for at least two years. Key qualifications include a valid contractor's license, no debarment, no terminated-for-default projects in the past five years, and prior experience working at DOE or DOD facilities. Interested vendors should express interest via the SAM.gov posting or by emailing the provided contact.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF SLAC Natl Accel Lab -DOE Contractor
  PSC  
LOCATION: Not Given
Primary Contact
Sam Kallas
Not Given

Links (0)

Attachments (38)

Document
Size
Access
Updated
DRAFT_B2_01.0_RFP_Cover_Letter_PCW_Skid_Upgrade.pdf
868.45 KB
Public
Mar 20, 2026
DRAFT_B2_01.1_SLAC_Entry_REAL_ID.pdf
187.42 KB
Public
Mar 20, 2026
DRAFT_B2_01.2_SLAC_Visitor_Map.pdf
98.3 KB
Public
Mar 20, 2026
DRAFT_B2_01.3_Grounding_Requirements_for_Generators.pdf
112.64 KB
Public
Mar 20, 2026
DRAFT_B2_01.4_GFCI_Protection_of_Temp_Power.pdf
175.95 KB
Public
Mar 20, 2026
DRAFT_B2_01.5_Tree_Shrub_Protection_Guideline.pdf
399.55 KB
Public
Mar 20, 2026
DRAFT_B2_01.6_SLAC_BIO_Plan_Submittal_Trailer_Conex_Offices.pdf
353.24 KB
Public
Mar 20, 2026
DRAFT_B2_01.7_SLAC_Construction_Safety_Requirements_Manual.pdf
1.33 MB
Public
Mar 20, 2026
DRAFT_B2_02_RFP_Section_A_(Subcontract_Form).pdf
770.44 KB
Public
Mar 20, 2026
DRAFT_B2_03_RFP_Section_B_(Supplies_or_Services_and_Price_Costs).pdf
682.32 KB
Public
Mar 20, 2026
DRAFT_B2_04.0_RFP_Section_C_Cover_(Specs_SOW).pdf
707.02 KB
Public
Mar 20, 2026
DRAFT_B2_04.1_SOW_PCW_Skid_Upgrade_LCLS-II-HE.pdf
1.8 MB
Public
Mar 20, 2026
DRAFT_B2_04.2_Ref_1_Inspection_Record.pdf
733.57 KB
Public
Mar 20, 2026
DRAFT_B2_04.3_Ref_2_CO2_Chillers_Drawing_Set.pdf
18.05 MB
Public
Mar 20, 2026
DRAFT_B2_04.4_Ref_3_CO2_Chillers_Specs.pdf
2.96 MB
Public
Mar 20, 2026
DRAFT_B2_04.5_Ref_4_PCW_Skid_Demo_Drawing_Set.pdf
5.89 MB
Public
Mar 20, 2026
DRAFT_B2_04.6_Ref_5_XPP_Design_PCW_Branches.pdf
48.38 MB
Public
Mar 20, 2026
DRAFT_B2_04.7_Ref_6_XPP_Design_Specs.pdf
104.53 MB
Public
Mar 20, 2026
DRAFT_B2_04.8_Ref_7_Inspection_Record_PCW_Skid.pdf
721.69 KB
Public
Mar 20, 2026
DRAFT_B2_05_RFP_Section_F_(Deliveries_Performance).pdf
805.32 KB
Public
Mar 20, 2026
DRAFT_B2_06.0_RFP_Section_G_(General_TsCs).pdf
694.1 KB
Public
Mar 20, 2026
DRAFT_B2_06.1_Fixed_Price_Construction_March2024.pdf
2.1 MB
Public
Mar 20, 2026
DRAFT_B2_07_RFP_Section_H_(Special_Terms_Conditions).pdf
728.73 KB
Public
Mar 20, 2026
DRAFT_B2_08.0_RFP_Section_J_(List_of_Attachments).pdf
786.47 KB
Public
Mar 20, 2026
DRAFT_B2_08.1_DB_WD_CA20260018_013026_Mod_4.pdf
252.67 KB
Public
Mar 20, 2026
DRAFT_B2_08.2_Subcontractor_IIPP_Form.pdf
228.98 KB
Public
Mar 20, 2026
DRAFT_B2_08.3_Work_Classification_Form_Non-Green.pdf
385.7 KB
Public
Mar 20, 2026
DRAFT_B2_08.4_SF1413-23a.pdf
687.27 KB
Public
Mar 20, 2026
DRAFT_B2_08.5_SubcontractorFormSQF.pdf
322.46 KB
Public
Mar 20, 2026
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf
582.5 KB
Public
Mar 20, 2026
DRAFT_B2_08.7_Final_Release.pdf
768.45 KB
Public
Mar 20, 2026
DRAFT_B2_08.8_Final_Inspection_Report.pdf
701.36 KB
Public
Mar 20, 2026
DRAFT_B2_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf
722.35 KB
Public
Mar 20, 2026
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf
65.44 KB
Public
Mar 20, 2026
DRAFT_B2_10.0_RFP_Section_L_Instructions_to_Offerors.pdf
1.4 MB
Public
Mar 20, 2026
DRAFT_B2_10.1_RFP_Section_L_Bid_Breakdown.pdf
1.03 MB
Public
Mar 20, 2026
DRAFT_B2_10.2_RFP_Section_L_362602_RFI_Log.pdf
721.5 KB
Public
Mar 20, 2026
DRAFT_B2_11_RFP_Section_M_Evaluation_Factors.pdf
1.37 MB
Public
Mar 20, 2026


Data sourced from SAM.gov. View Official Posting »