Galaxy VS UPS Equipment and Manufacturer Assembly and Start-Up – No Substitutions

Notice ID:SJ484181

BSA/BNL seeks quotations for a specified Galaxy VS UPS configuration and related services, including a 15 kW 208 V UPS with seven 9 Ah battery strings total, maintenance bypass cabinet, cable/conduit box, modular battery cabinet, one-year on-site warranty extension, manufacturer assembly/start-up, and shipping to Upton, NY. The configuration must provide 155 minutes of runtime at 8.25 kW and 76.5 minutes at 15 kW, with no substitutions or equivalent products acceptable. Assembly and start-up must be performed by the manufacturer to preserve warranty coverage, while electrical installation is excluded and will be handled separately by BNL. Quotations must include manufacturer part numbers, itemized pricing for all equipment/services/shipping, total price, validity, exceptions, and delivery availability, lead times, and the proposed assembly/start-up schedule. The BSA General Terms and Conditions for Commercial Products and Services, Revision 25.0 dated September 10, 2026, will apply to any resulting award.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF BROOKHAVEN NATL LAB -DOE CONTRACTOR
  PSC   6130 CONVERTERS, ELECTRICAL, NONROTATING
LOCATION: Not Given
Primary Contact
Stephen Johnston
631-***-5742


Data sourced from SAM.gov. View Official Posting »