High Speed Melt Pool Camera
PR501671
UT-Battelle, LLC, as the management and operating contractor of Oak Ridge National Laboratory, requires a Cavitar Welding Camera System and Cavitar Protective Window or equivalent for ORNL’s Manufacturing Science Division. The requirement is detailed in a Bill of Materials attachment. Additional attachments cover commercial products and services terms and conditions, prime flowdown clauses, and representations and certifications. Prospective bidders should review these attachments to understand the commercial terms and compliance requirements.