Inactive
Notice ID:PIPII-348317-STE-REV01
AMENDMENT 01: UPLOADING ALL DOCUMENTS INDIVIDUALLY. The Subcontractor shall furnish Two Arc Safe Medium Voltage Motor Starters and Three Medium Voltage Arc Resistant Motor Disconnect Switches as descr...
AMENDMENT 01: UPLOADING ALL DOCUMENTS INDIVIDUALLY. The Subcontractor shall furnish Two Arc Safe Medium Voltage Motor Starters and Three Medium Voltage Arc Resistant Motor Disconnect Switches as described in ISD/Engineering specifications (Project Number 4-3-3C): Specification Section 26 13 16 - Medium Voltage Arc Resistant Disconnect Switch (November 30, 2023), Specification Section 26 13 14 - Medium voltage motor starter (November 30, 2023), and Specification Section 26 05 00 - Basic Electrical Requirements (October 16, 2023) as required in the detailed description contained herein. All pricing shall include freight with delivery FOB Fermi National Accelerator Laboratory, Batavia, IL. NOTE: CUT OFF FOR QUESTIONS IS DECEMBER 18, 2023.