Inactive
Notice ID:KWG1008-2019
The Project will include Conceptual Design Services and Bridging Documents which are a part of the Construction Documents, so that the selected supplier provides A-E services throughout the life of th...
The Project will include Conceptual Design Services and Bridging Documents which are a part of the Construction Documents, so that the selected supplier provides A-E services throughout the life of the Linear Assets Modernization Project (LAMP). The objective of the project is to upgrade the highest priority utility systems to increase the reliability, capability, and safety of the Lab’s infrastructure to meet the DOE’s mission. The project will design repair strategies for utility systems throughout the Lab. The utility systems include, but are not limited to, domestic water, natural gas, storm drain, sanitary sewer, electrical, and communication. The design schedule for the LAMP is anticipated to be 10-12 years. The construction duration is the same since construction will need to occur in multiple phases. A Master Agreement (MA) award is anticipated in Feb/Mar 2020. Subcontract award for construction services to builder(s) is anticipated in three to four segments over the 10-12-year period with the first construction segments anticipated to be awarded in 2021.