Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:ISD_362164_DA
On October 22, 2024, Amendment 02 was issued. This Amendment to the RFP is being issued to provide responses to questions from prospective offerors. Please see the attached Q&A document and epoxy floo...
On October 22, 2024, Amendment 02 was issued. This Amendment to the RFP is being issued to provide responses to questions from prospective offerors. Please see the attached Q&A document and epoxy flooring picture attachment. On October 3, 2024, Amendment 01 was issued. This Amendment to the RFP is being issued to include the following exhibits/documents on SAM.gov: a. Exhibit J - Proposal Certifications, Form PUR-466, Rev. 1 (10/14/2021). b. Exhibit K - Subcontractor Annual Representations & Certifications (SARC), Form SARC (Rev. 3) (04/08/2022). c. Exhibit L - Construction Environmental, Safety & Health Certification (CESHC). d. Business Visitor Registration Instructions & Directions The Scope of Work for this project includes: Remove and replace main entrance/exit double doors with frame and all components. (Prime and Paint as well). Doors to be ENERGY STAR certified with a thermal break. Remove and replace (2) south side single doors with frame and all components. (Prime and Paint also). Doors to be ENERGY STAR certified with a thermal break. Remove and replace (11) EOL windows. Windows to be a minimum double-pane ENERGY STAR certified with a low-e coating. Re-Epoxy roughly 500 Sq Ft of concrete flooring. Remove and replace EOL commode, sink and mirror in restroom. Install a large new sink. (sink onsite already at C0) Patch and Paint Walls in the hallway and 2 rooms that were re done. For more detailed information, please review the attached SOW titled, "Exhibit A SOW C0_Renovation."