Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:APS-TD-308504-STE-2
A Cavity String Assembly Cleanroom 2 at MP9 is required for cleaning and assembly of superconducting radio frequencty (SRF) components for the Proton Improvrement Plan (PIP-II) project. The PIP-II par...
A Cavity String Assembly Cleanroom 2 at MP9 is required for cleaning and assembly of superconducting radio frequencty (SRF) components for the Proton Improvrement Plan (PIP-II) project. The PIP-II particle accelerator will be the new heart of Fermilab, featuring a brand-new, 800-MeV, leading-edge superconducting linear accelerator. Its high intensity proton beam will power a broad range of particle physics experiments for decades to come, and maintain Fermilab’s leadership as one of the world’s premier particle physics laboratories. PIP-II will enable the most intense high-energy neutrino beam for the laboratory’s flagship project—the Long Baseline Neutrino Facility and Deep Underground Neutrino Experiment (LBNF/DUNE).