MOC Service Garage and Warehouse Roof Replacement
Montrose Service Garage and Warehouse Roof Replacement to remove existing roof system, and replace with new TPO membrane roof system and architectural roof edge facia metal.
Montrose Service Garage and Warehouse Roof Replacement to remove existing roof system, and replace with new TPO membrane roof system and architectural roof edge facia metal.
The Western Area Power Administration requires a contractor to provide all resources for a roof replacement at the Montrose Power Operations Center in Montrose, Colorado. The project involves removing the existing roof system and installing a new TPO membrane roof with architectural metal edge fascia. The estimated construction cost is between $500,000 and $1,000,000, and the performance period is 120 calendar days after the Notice to Proceed. This opportunity is a 100% small business set-aside under NAICS code 238160, and the Buy American Act applies. The solicitation will be issued electronically on or about August 3, 2026, via FedConnect and SAM.gov.
The Western Area Power Administration requires a contractor to provide all resources for a roof replacement at the Montrose Power Operations Center in Montrose, Colorado. The project involves removing the existing roof system and installing a new TPO membrane roof with architectural metal edge fascia. The estimated construction cost is between $500,000 and $1,000,000, and the performance period is 120 calendar days after the Notice to Proceed. This opportunity is a 100% small business set-aside under NAICS code 238160, and the Buy American Act applies. The solicitation will be issued electronically on or about August 3, 2026, via FedConnect and SAM.gov.