Y--Stegall Substation Stage 07 Phase 01
Amendment (0002) is to update Drawings with redline markings, extend bid closing date, and change the bid opening date as part of the Stegall Substation Stage 07 Phase 01 Project.
Amendment (0002) is to update Drawings with redline markings, extend bid closing date, and change the bid opening date as part of the Stegall Substation Stage 07 Phase 01 Project.
Amendment (0001) is to post Q/A from industry and extend bid closing date as part of the Stegall Substation Stage 07 Phase 01 Project.
The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960’s e...
The Western Area Power Administration requires a contractor to provide all resources for the Stegall Substation Stage 07 Phase 01 Construction Project in Stegall, Nebraska, which involves replacing end-of-life equipment and constructing a new control building. The estimated construction magnitude is between $5 million and $10 million, with a performance period of 800 calendar days after the Notice to Proceed. This 100% small business set-aside solicitation will be issued electronically on or about June 9, 2026, and the Buy American Act applies.