Y--Glendo-Lusk Rural Tap and Quinn Creek Substation
Amendment (0002) Extend Solicitation Close Date, Update Bid Schedule, Specifications W/redline changes, Drawings, KMZ files, Geotechnical Report, and Q/A from industry.
Amendment (0002) Extend Solicitation Close Date, Update Bid Schedule, Specifications W/redline changes, Drawings, KMZ files, Geotechnical Report, and Q/A from industry.
Amendment (0001) to add KMZ files and post Q/A from industry for the Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and Quinn Creek Substation project.
The Western Area Power Administration requires a contractor to upgrade 35 miles of a 69kV transmission line to 115kV and construct a new Quinn Creek Substation in Platte and Niobrara counties, Wyoming. The project involves replacing the existing line with a new wood pole H-frame transmission line and building the substation on approximately 5 acres of open rangeland. Performance of services will take place in Wyoming, with specific locations including the Glendo Substation, Lusk Rural Tap, and the new Quinn Creek Substation site. The anticipated period of performance is 800 calendar days after Notice to Proceed or by December 2028, with an estimated construction magnitude greater than $10M. This opportunity is a 100% small business set-aside under NAICS 237130, and the Buy American Act applies.
The Western Area Power Administration requires a contractor to upgrade 35 miles of a 69kV transmission line to 115kV and construct a new Quinn Creek Substation in Platte and Niobrara counties, Wyoming. The project involves replacing the existing line with a new wood pole H-frame, building the substation on about 5 acres, and working within existing rights-of-way. Performance is expected within 800 calendar days after Notice to Proceed or by December 2028. The estimated construction cost is greater than $10 million. This is a 100% small business set-aside solicitation.