Argon Piping Supply, Installation and Testing

Notice ID:73573

This opportunity involves supplying, installing, and testing a stainless-steel pipeline to transport gaseous argon underground as part of the DUNE experiment. The pipeline will run from the Ross Shaft Argon Receiving station to the Central Utility Cavern at the 4850 Level. Performance of services is at the LBNF site, with the pipeline transitioning between 8-inch and 6-inch diameters along the route. No budget amount is specified in the description. The proposal due date is July 27, 2026.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF FERMILAB - DOE CONTRACTOR
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Jerry King
217-***-1120
Alt Contact
Susan Underwood
630-***-2021

Links (1)

Attachments (19)

Document
Size
Access
Updated
Copy of 2026.07.10 - Questions #2 - U2623.xlsx
28.31 KB
Public
Jul 17, 2026
Amend 02 to RFP LBNF-735735-JK.pdf
114.81 KB
Public
Jul 17, 2026
K-3 FL-11_Rev1.pdf
332.27 KB
Public
Jun 2, 2026
K-4 FL-57B (Rev. 1-07).pdf
21.66 KB
Public
Jun 2, 2026
K-2 SARC_Subcontractor Annual RepsCerts Rev 4.pdf
362.33 KB
Public
Jun 2, 2026
K-1 PUR-466_Proposal Certifications-.pdf
401.53 KB
Public
Jun 2, 2026
J-11 Price Sheet including Fully Burdened Hourly Rate.xlsx
12.67 KB
Public
Jun 2, 2026
J-10 South Dakota Wase Determinatin 20260016.txt
12.74 KB
Public
Jun 2, 2026
J-9 FL-55 Small Business Subcontracting Plan (Rev. 6-23) 14.0 - Exhibit III-G.pdf
392.03 KB
Public
Jun 2, 2026
J-7 014100-8-2025-South Dakota Quality Requirements.pdf
331.37 KB
Public
Jun 2, 2026
J-6.1 7010_F1_Fermilab Subcontractor Safety Information Questionnaire.docx
41.62 KB
Public
Jun 2, 2026
J-6 013100_7-31-2025 FermiForward_South_Dakota.pdf
1.27 MB
Public
Jun 2, 2026
J-5 010010_General_Requirements_SD_4_2025_FFDG.docx
96.69 KB
Public
Jun 2, 2026
J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024.pdf
3.4 MB
Public
Jun 2, 2026
J-3 Argon Piping Supply and Install SOW (2).docx
4.15 MB
Public
Jun 2, 2026
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf
313.89 KB
Public
Jun 2, 2026
J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025).pdf
327.11 KB
Public
Jun 2, 2026
RFP Argon Piping R1 6.1.2026.docx
92.59 KB
Public
Jun 2, 2026
1. RFP Letter 6.1.2026 R1.docx
49.3 KB
Public
Jun 2, 2026


Data sourced from SAM.gov. View Official Posting »

Argon Piping Supply, Installation and Testing

Notice ID:73573

This opportunity involves supplying, installing, and testing a stainless-steel pipeline to transport gaseous argon underground as part of the DUNE experiment. Approximately 40,000 metric tons of liquid argon will be received, stored, converted to gas, and moved through an 8-inch and 6-inch diameter schedule 10 pipeline. The pipeline route runs from the Argon Receiving Facility to the Ross shaft, down to the 4850 Level, and then to the Central Utility Cavern. Performance of services is at the LBNF site, specifically involving the Ross Shaft and underground levels. No budget amounts or non-bid timelines are specified in the description.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF FERMILAB - DOE CONTRACTOR
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Jerry King
217-***-1120
Alt Contact
Susan Underwood
630-***-2021


Data sourced from SAM.gov. View Official Posting »

Argon Piping Supply, Installation and Testing

Notice ID:73573

The Department of Energy (DOE) is seeking a contractor to supply, install, and test a stainless-steel pipeline for transporting argon gas underground at the Long-Baseline Neutrino Facility (LBNF). The work involves piping of varying diameters (8-inch and 6-inch Schedule 10) from the Ross Shaft Argon Receiving station to the Central Utility Cavern (CUC) at the 4850 Level. The project supports the DUNE experiment, requiring the transport of approximately 40,000 metric tons of argon. Performance of services will be at the LBNF site, specifically involving the Ross Shaft and underground levels. No budget amounts or submission timelines are specified in the description.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF FERMILAB - DOE CONTRACTOR
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Jerry King
217-***-1120
Alt Contact
Susan Underwood
630-***-2021


Data sourced from SAM.gov. View Official Posting »