Argon Piping Supply, Installation and Testing
This opportunity involves supplying, installing, and testing a stainless-steel pipeline to transport gaseous argon underground as part of the DUNE experiment. The pipeline will run from the Ross Shaft Argon Receiving station to the Central Utility Cavern at the 4850 Level. Performance of services is at the LBNF site, with the pipeline transitioning between 8-inch and 6-inch diameters along the route. No budget amount is specified in the description. The proposal due date is July 27, 2026.