Inactive
Notice ID:4-B157-P-00121-00
There are 2 separate SOW's to design and install stairs inside the APS ring per the suggested specs. SOW-1: ISN (19-ID) and HEXM (20-ID) Beamline Crossover The contractor shall provide all labor, mate...
There are 2 separate SOW's to design and install stairs inside the APS ring per the suggested specs. SOW-1: ISN (19-ID) and HEXM (20-ID) Beamline Crossover The contractor shall provide all labor, materials, tools, equipment, supervision and all necessary appurtenances to provide fabrication, testing, acceptance, delivery, and installation of beamline crossover at ISN (19-ID) and HEXM (20-ID) beamlines in the Advanced Photon Source experiment hall corridor. SOW-2: LBB-HEXM Stairs (20-ID-E) The contractor shall provide all labor, materials, tools, equipment, supervision and all necessary appurtenances to provide fabrication, testing, acceptance, delivery, and installation of stairs just upstream of the 20-ID-E end-station at the Advanced Photon Source. All related documents can be accessed at the below Link. This is password protected so please contact the Procurement Specialist: Robert Kman (kman@anl.gov) for the password. Box Link: https://anl.box.com/s/5oih1qna2c3tkc9ipbaaqyxrr97012x2