Inactive
Notice ID:4-B138-Q-00253-00
The contractor shall complete the following scope of work as laid out in this Statement of Work (SOW). This includes fabrication, quality control, testing, and documentation of four (4) total A:VC13 c...
The contractor shall complete the following scope of work as laid out in this Statement of Work (SOW). This includes fabrication, quality control, testing, and documentation of four (4) total A:VC13 chambers. One of the chambers shall be internally NEG-coated. The design, drawings and CAD models, and procedures are proprietary. The contractor shall not share APSU’s proprietary design, drawings and model, and procedures with other buyers. The contractor shall not use APSU’s design, drawings and model, and procedures in their own production outside the scope of work defined in this SOW.