Fermilab-Mu2e Asphalt Pad- 379050_DG
The Subcontractor shall perform all work as described in the Statement of Work for the Mu2e Asphalt Pad included as Exhibit A. All work shall include transportation, overhead, bonding costs, insurance... The Subcontractor shall perform all work as described in the Statement of Work for the Mu2e Asphalt Pad included as Exhibit A. All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.
Links (0)
Attachments (17)
Data sourced from SAM.gov.
View Official Posting »