Inactive
Notice ID:31878PIPIICryogenicsPlantBuildingConstruction20191114
Fermi Research Alliance LLC under Prime Contract No. DE-AC02-07CH11359 is soliciting for construction of an industrial building and related infrastructure. The end use of the building will be to house...
Fermi Research Alliance LLC under Prime Contract No. DE-AC02-07CH11359 is soliciting for construction of an industrial building and related infrastructure. The end use of the building will be to house cryogenic equipment. 1) Please start here. Watch: PIP-II YouTube Video https://www.youtube.com/watch?v=NRo4lVUQmGI&feature=youtu.be AMENDMENT 1: UPDATE TO PROJECT MANUAL J3 AND DRAWINGS J4. DUE DATE FOR SUBMISSION OF PROPOSALS REMAINS UNCHANGED. SEE AMENDMENT 1 LINK. AMENDMENT 2: INCREASES WARM COMPRESSOR STATION TRANSFORMATION BASED ON AIR LIQUIDE REQUIRMENTS; RELOCATES ELECTRICAL EQUIPMENT FROM INSIDE BUILDING TO AN EXTERNAL LOCATION TO FREE UP SPACE INSIDE THE BUILDING; ADDS CONCRETE EQUIPMENT BASES PER AIR LIQUIDE REQUIREMENTS; INCLUDES BID PERIOD QUESTIONS RECEIVED SINCE AMENDMENT 1 WAS ISSUED. DUE DATE FOR SUBMISSION OF PROPOSALS REMAINS UNCHANGED. SEE AMENDMENT 2 LINK AMENDMENT 3: REVISES WEIGHT OF EXISTING GASEOUS HELIUM TANKS, INCLUDES BID PERIOD QUESTIONS RECEIVED SINCE AMENDMENT 2 WAS ISSUED. DUE DATE FOR SUBMISSION OF PROPOSALS REMAINS UNCHANGED. SEE AMENDMENT 3 LINK. Reminder: A) Questions will no longer be answered. Request for Information RFI period closed December 13.