Inactive
Notice ID:2-B139-P-00238-00
Scope of Work The Collimator Assembly shall be fabricated to drawings according to the APS Upgrade technical, quality assurance and acceptance requirements. Deliverables • Tungsten Collimator Assembly...
Scope of Work The Collimator Assembly shall be fabricated to drawings according to the APS Upgrade technical, quality assurance and acceptance requirements. Deliverables • Tungsten Collimator Assembly as specified by drawing A304-BC0100 and associated documents • Critical inspection dimensions report, including fiducials • Material certification report (Tungsten) • Vacuum leak test report • Bakeout data • RGA Scan reports