False

Argon Piping Supply, Installation and Testing

Notice ID:04012026

This opportunity involves the supply, installation, and testing of a stainless-steel pipeline to transport argon gas for the DUNE experiment at the LBNF. The work requires transporting approximately 40,000 metric tons of argon from the surface to the Central Utility Cavern (CUC) at the 4850 Level. The pipeline system will connect the Ross Shaft Argon Receiving station to the CUC, with specific diameter and schedule requirements for different segments. The performance location is the LBNF site, specifically from the surface receiving facility, down the Ross shaft, to the underground 4850 Level.

Department/Ind.Agency Subtier Office
ENERGY, DEPARTMENT OF ENERGY, DEPARTMENT OF FERMILAB - DOE CONTRACTOR
NAICS Not provided
  PSC   (blank)
LOCATION: Not Given
Primary Contact
Jerry King
217-***-1120

Links (0)

Attachments (1)

Document
Size
Access
Updated
RFI.zip
124.26 MB
Public
Apr 1, 2026


Data sourced from SAM.gov. View Official Posting »