Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W91ZLK-22-Q-0001
29 NOV 2021: CORRECTIONS Firm Fixed Price (FFP) proposals MUST be signed, dated, and received by 10:00 a.m. EST, 02 December 2021 Questions and responses have been posted. The contractor shall design,...
29 NOV 2021: CORRECTIONS Firm Fixed Price (FFP) proposals MUST be signed, dated, and received by 10:00 a.m. EST, 02 December 2021 Questions and responses have been posted. The contractor shall design, fabricate, and install new 22 oz. fabric panels for the roof and end walls of CCDC-CBC’s existing fabric walled aluminum framed structure. The structure is ~135’ long and has 10 ribs (9 bays). The roof section shall be made of one large membrane panel. The end wall has one penetration for the exhaust fan and is approximately 60 ft. wide and 30 ft. tall. The replacement fabric shall be the same material weight, type, and color as the rest of the structure. The replacement fabric shall include pockets at just above ground level to be used for applying down tension. The roof replacement shall be completed without the need to remove items stored inside.