CES Expansion UPS Upgrade

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:W91SMC26QA016

The 183d Wing at Abraham Lincoln Capital Airport Air National Guard Base in Springfield, IL requires a firm-fixed-price construction contract to upgrade the UPS system in Building 8. The contractor will remove an existing 10 kW UPS and install a new scalable 20 kW UPS system, including electrical preparation, sealing penetrations, and operational testing. A site visit is scheduled for 11 August 2026 at 1:00 PM. The period of performance is 120 days or less after issuance of the Notice to Proceed. No budget amount is specified in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W7M6 USPFO ACTIVITY IL ARNG
  PSC   CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS


Data sourced from SAM.gov. View Official Posting »

CES Expansion UPS Upgrade

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W91SMC26QA016

The 183d Wing at Abraham Lincoln Capital Airport Air National Guard Base in Springfield, IL requires a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. The contractor must remove the existing 10 kW UPS and install a new scalable 20 kW system (configurable up to 30 kVA/kW), including demolition, electrical preparation, sealing penetrations, and full testing. A non-mandatory site visit is scheduled for 11 August 2026 at 1:00 PM local time. The period of performance is 120 days or less after issuance of the Notice to Proceed. No budget amount is specified in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W7M6 USPFO ACTIVITY IL ARNG
  PSC   Y1AZ CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS


Data sourced from SAM.gov. View Official Posting »