CES Expansion UPS Upgrade
The 183d Wing at Abraham Lincoln Capital Airport Air National Guard Base in Springfield, IL requires a firm-fixed-price construction contract to upgrade the UPS system in Building 8. The contractor will remove an existing 10 kW UPS and install a new scalable 20 kW UPS system, including electrical preparation, sealing penetrations, and operational testing. A site visit is scheduled for 11 August 2026 at 1:00 PM. The period of performance is 120 days or less after issuance of the Notice to Proceed. No budget amount is specified in this description.