CES Expansion UPS Upgrade
The 183d Wing at Abraham Lincoln Capital Airport Air National Guard Base in Springfield, IL requires a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. The contractor must remove the existing 10 kW UPS and install a new scalable 20 kW system (configurable up to 30 kVA/kW), including demolition, electrical preparation, sealing penetrations, and full testing. A non-mandatory site visit is scheduled for 11 August 2026 at 1:00 PM local time. The period of performance is 120 days or less after issuance of the Notice to Proceed. No budget amount is specified in the description.