Inactive
Notice ID:W91QVN24R0118
Replace pre-existing furniture in Building P2200, 3rd Floor. The contractor shall furnish all management, supervision, labor, equipment, material, transportation and supplies necessary to replace, rem...
Replace pre-existing furniture in Building P2200, 3rd Floor. The contractor shall furnish all management, supervision, labor, equipment, material, transportation and supplies necessary to replace, remove, and dispose of pre-existing office furniture in Bldg. P2200, 3rd Floor. The contractor shall be responsible for the delivery offloading, unpacking, assembly, installation, and debris removal from the site for the entire furniture tear down of identified furniture in Bldg. P2200, 3rd Floor. See Statement of Work and attached Salient Characteristics.