Non-Slip Flooring Project

Inactive 8(a) Set-Aside (FAR 19.8)
Notice ID:W91QV124R0127

This statement of work will outline the general scope of adding non-slip flooring to Fire Station 9 (Building 989). Work Area at this location will be the concrete floor within the garage bays Buildin...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QM MICC-FT BELVOIR
  PSC   FLOOR COVERINGS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »