Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W91QV1016770
The Contractor shall determine the best disposal method for refuse / solid waste management to maximize efficiencies. The disposal method shall be approved by the KO. The Contractor shall empty refuse...
The Contractor shall determine the best disposal method for refuse / solid waste management to maximize efficiencies. The disposal method shall be approved by the KO. The Contractor shall empty refuse / solid waste containers, compacters, and roll-offs at 85% capacity except for containers designated with more frequent intervals designated in TE (Technical Exhibit) 2. In the event of demand fluctuations, frequency adjustments must be approved by KO. The Contractor shall remove all litter and waste on the ground within a ten (10) foot radius of the container. The Contractor shall track and report to the COR/ACOR all container weights and number of services per week. The Contractor shall perform services IAW approved scheduled routes for pick-up and respond to calls for service when dumpsters reach full before scheduled pick-up.