CJAG Power Distribution
The contractor must provide all personnel, equipment, and materials to construct approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer for the CJAG Load Line 6 Electrical System. The work will be performed at the Load Line 6 area of Camp James A. Garfield Joint Training Center and includes utility coordination, trenching, conduit installation, cabling, transformer installation, testing, and restoration. An offer guarantee is required, and the contractor must furnish any required performance and payment bonds within 10 calendar days after receipt of order. Site visits are encouraged and can be coordinated by contacting the specified individuals.