Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts. The work must be performed with minimal disruption to the occupied, mission-critical facilities within restricted areas, requiring precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, upgrading protection against High Altitude Electromagnetic Pulse events, and replacing all systems in the onsite power plant. The final system must incorporate new generators and power distribution resources to meet Uptime Institute Tier IV redundancy criteria for prolonged reliability. The project is funded under the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255

Links (4)

Attachments (36)

Document
Size
Access
Updated
Amendment 0009.pdf
577.83 KB
Public
Mar 6, 2026
Amendment 0009 Update Sheet X-601.pdf
604.03 KB
Public
Mar 6, 2026
Amendment 0009 Updated Sheet 3-T-112.pdf
333.79 KB
Public
Mar 6, 2026
Amendment 0009 Updated Sheet Vol 1 CU-201.pdf
1.43 MB
Public
Mar 6, 2026
Amendment 0009 Update Sheet Vol 4 ES103 and ES501.pdf
737.7 KB
Public
Mar 6, 2026
Amendment 0008 Attachment 11676438.pdf
2.61 MB
Public
Mar 4, 2026
Amendment 0008 Submission Requirements and Evaluation Criteria.pdf
4.66 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11690371.pdf
2.06 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11680669.pdf
1.84 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699397.pdf
1.84 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11680816.pdf
1.06 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699366.pdf
699.22 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699385.pdf
601.67 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11712612.pdf
543.19 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699407.pdf
460.74 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699373.pdf
328.4 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699393.pdf
297.65 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11692148.pdf
243 KB
Public
Mar 4, 2026
Amendment 0007.pdf
187.72 KB
Public
Feb 27, 2026
Amendment 0006.pdf
209.5 KB
Public
Feb 26, 2026
Amendment 0005.pdf
516.74 KB
Public
Feb 13, 2026
Amendment 0004.pdf
2.35 MB
Public
Feb 10, 2026
Amendment 0004 Submission Requirements and Evaluation.pdf
3.84 MB
Public
Feb 10, 2026
Solicitation W912WJ26RA003.pdf
5.65 MB
Public
Dec 18, 2025
Submission Requirements and Evaluation Criteria.pdf
209.73 KB
Public
Dec 18, 2025
Site Security Requirements.pdf
183.14 KB
Public
Dec 18, 2025
JA 01 - Power Filters (Redacted).pdf
507.99 KB
Public
Dec 18, 2025
JA 02 - Disconnect Switches (Redacted).pdf
927.15 KB
Public
Dec 18, 2025
JA 03 - Fire Alarm System (Redacted).pdf
272.56 KB
Public
Dec 18, 2025
Amendment 0001.pdf
430.56 KB
Public
Jan 15, 2026
Amendment 0001 - Submission Requirements and Evaluation Criteria.pdf
207.56 KB
Public
Jan 15, 2026
Amendment 0002.pdf
595.05 KB
Public
Jan 20, 2026
Attachment A - Joint Venture Agreement.pdf
77.68 KB
Public
Jan 20, 2026
Attachment B - Past Performance Questionnaire.pdf
162.9 KB
Public
Jan 20, 2026
Attachment C - Small Business Participation Commitment Document.pdf
215.25 KB
Public
Jan 20, 2026
Amendment 0003.pdf
697.9 KB
Public
Feb 2, 2026


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts. The work must be performed with minimal disruption to the occupied, mission-critical facilities within restricted areas, requiring precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, upgrading protection against High Altitude Electromagnetic Pulse events, and replacing all systems in the onsite power plant. The final system must incorporate new generators and power distribution resources to meet Uptime Institute Tier IV redundancy criteria for prolonged reliability. The project is funded under the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255

Links (4)

Attachments (31)

Document
Size
Access
Updated
Amendment 0008 Attachment 11676438.pdf
2.61 MB
Public
Mar 4, 2026
Amendment 0008 Submission Requirements and Evaluation Criteria.pdf
4.66 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11690371.pdf
2.06 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11680669.pdf
1.84 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699397.pdf
1.84 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11680816.pdf
1.06 MB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699366.pdf
699.22 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699385.pdf
601.67 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11712612.pdf
543.19 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699407.pdf
460.74 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699373.pdf
328.4 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11699393.pdf
297.65 KB
Public
Mar 4, 2026
Amendment 0008 Attachment 11692148.pdf
243 KB
Public
Mar 4, 2026
Amendment 0007.pdf
187.72 KB
Public
Feb 27, 2026
Amendment 0006.pdf
209.5 KB
Public
Feb 26, 2026
Amendment 0005.pdf
516.74 KB
Public
Feb 13, 2026
Amendment 0004.pdf
2.35 MB
Public
Feb 10, 2026
Amendment 0004 Submission Requirements and Evaluation.pdf
3.84 MB
Public
Feb 10, 2026
Solicitation W912WJ26RA003.pdf
5.65 MB
Public
Dec 18, 2025
Submission Requirements and Evaluation Criteria.pdf
209.73 KB
Public
Dec 18, 2025
Site Security Requirements.pdf
183.14 KB
Public
Dec 18, 2025
JA 01 - Power Filters (Redacted).pdf
507.99 KB
Public
Dec 18, 2025
JA 02 - Disconnect Switches (Redacted).pdf
927.15 KB
Public
Dec 18, 2025
JA 03 - Fire Alarm System (Redacted).pdf
272.56 KB
Public
Dec 18, 2025
Amendment 0001.pdf
430.56 KB
Public
Jan 15, 2026
Amendment 0001 - Submission Requirements and Evaluation Criteria.pdf
207.56 KB
Public
Jan 15, 2026
Amendment 0002.pdf
595.05 KB
Public
Jan 20, 2026
Attachment A - Joint Venture Agreement.pdf
77.68 KB
Public
Jan 20, 2026
Attachment B - Past Performance Questionnaire.pdf
162.9 KB
Public
Jan 20, 2026
Attachment C - Small Business Participation Commitment Document.pdf
215.25 KB
Public
Jan 20, 2026
Amendment 0003.pdf
697.9 KB
Public
Feb 2, 2026


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities will remain occupied, necessitating precise construction phasing to minimize disruption to mission-critical operations. Key project elements include integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, providing new backup power with enhanced microgrid controls, and installing electrical duct banks. The work must meet Uptime Institute Tier IV redundancy criteria and upgrade facilities against High Altitude Electromagnetic Pulse (HEMP) events. All work aligns with the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255

Links (4)

Attachments (18)


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities will remain occupied, necessitating precise construction phasing to minimize disruption to mission-critical operations. The work includes integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, and installing new generators, UPS systems, and electrical duct banks. A key requirement is upgrading the facility's protective barrier against High Altitude Electromagnetic Pulse (HEMP) events and meeting Uptime Institute Tier IV redundancy criteria. The project is funded under the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255

Links (4)

Attachments (18)


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities must remain occupied with minimal mission disruption, necessitating precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, and installing new backup power assets with enhanced microgrid controls. The work must achieve Uptime Institute Tier IV redundancy for mission-critical systems and upgrade facilities against High Altitude Electromagnetic Pulse events. All new equipment, including diesel generators and power distribution resources, will be incorporated into a cohesive control scheme for prolonged reliability.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities must remain occupied with minimal mission disruption, necessitating precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, and installing new generators and electrical duct banks. The work must achieve Uptime Institute Tier IV redundancy for mission-critical systems and upgrade facilities against High Altitude Electromagnetic Pulse events. The project is funded through the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities must remain occupied with minimal mission disruption, necessitating precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, and installing new backup power assets with enhanced microgrid controls. The work must achieve Uptime Institute Tier IV redundancy for mission-critical systems and upgrade facilities against High Altitude Electromagnetic Pulse (HEMP) events. This project is part of the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities must remain occupied with minimal mission disruption, necessitating precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, and installing new backup power assets with enhanced microgrid controls. The work must upgrade facilities against High Altitude Electromagnetic Pulse events and achieve Uptime Institute Tier IV redundancy for all mission-critical systems. All new equipment, including diesel generators and power distribution resources, will be incorporated into a cohesive control scheme for prolonged reliability.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION: Not Given
Primary Contact
Tyler Maryak
978-***-8049
Alt Contact
Ann Adley
978-***-8255


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities must remain occupied with minimal mission disruption, necessitating precise construction phasing. Key project elements include integrating a battery storage system with an existing wind turbine, replacing all systems in the onsite power plant, and installing new generators and electrical duct banks. The work must achieve Uptime Institute Tier IV redundancy for mission-critical systems and upgrade facilities against High Altitude Electromagnetic Pulse events. The project is funded through the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Notice ID:W912WJ26RA003

This project involves constructing a Power Generation Microgrid at the Cape Cod Space Force Station in Massachusetts, requiring work within restricted areas. The impacted facilities must remain occupied with minimal mission disruption, necessitating precise construction phasing. The project includes replacing all systems in the onsite power plant, integrating a battery storage system with an existing wind turbine, and installing new generators, UPS systems, and electrical duct banks. It aims to achieve Uptime Institute Tier IV redundancy and upgrade facilities against High Altitude Electromagnetic Pulse events. The work is funded under the Department of the Air Force Energy Resiliency, Conservation, and Investment Program.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   Y1QA CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)


Data sourced from SAM.gov. View Official Posting »

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station (CCSFS) in Bourne, MA

Inactive
Notice ID:W912WJ26RA003

The U.S. Army Corps of Engineers, New England District intends to issue a solicitation for an unrestricted fixed-firm price contract for Construction Services of a Power Generation Microgrid at Cape C...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SD ENDIST NEW ENGLAND
  PSC   CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »