Control Tower Chamber Equipment Painting, Colebrook River Lake, Colebrook, CT
This project involves preparing and painting various steel mechanical equipment items, including a spiral staircase, in the gate chamber at Colebrook River Lake in Colebrook, Connecticut. The existing paint coatings have partially failed, with areas of peeling, blistering, and rust. The estimated construction cost is between $100,000 and $250,000. The procurement is set aside for small business vendors under NAICS code 238320. Vendors must have an active SAM.gov registration to be considered.