Control Tower Chamber Equipment Painting, Colebrook River Lake, Colebrook, CT
This project involves preparing and painting various steel mechanical equipment items in the gate chamber at Colebrook River Lake in Colebrook, Connecticut. The work includes items such as bonnets, hydraulic piping, cylinders, and a spiral staircase, but excludes items not specifically listed. The existing paint coatings have partially failed, with areas of peeling, blistering, and rust. The estimated budget for construction is between $100,000 and $250,000. Performance of services will take place at Colebrook River Lake in Colebrook, Connecticut.