Arlington National Cemetery Boundary Wall Repairs Phase 6
The contractor must submit a technical proposal fully addressing the Statement of Work, along with a separate price proposal detailing labor, equipment, materials, and associated costs, all submitted electronically. The government will conduct a line-by-line technical review against the SOW, and the proposed price must align with the government estimate. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis using simplified acquisition procedures. The winning vendor must be technically acceptable and offer the lowest price among all acceptable proposals, with that price deemed fair and reasonable by the government.