Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin
The contractor must furnish all labor, materials, tools, and equipment to repair the drainage ditch at the Barren River Lake Tailwater Stilling Basin, performing all work in strict compliance with the specifications and applicable laws. Work must begin within 10 calendar days of Notice to Proceed and conclude within 180 calendar days after Notice to Proceed. The performance location is Barren River Lake, 11088 Finney Rd, Glasgow, KY 42141. This procurement is 100% set aside for small businesses under NAICS 238910 with a $19M size standard, and award will be based on the lowest total price. A site visit is highly recommended to verify existing conditions, bid bonds are required, and payment will be made via electronic funds transfer.