NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION
The project involves constructing a flush restroom facility at the tailwater recreation area of Nolin River Lake, Kentucky. The contractor must provide all labor, materials, tools, and equipment, and is responsible for planning, supervision, and compliance with all applicable laws. The estimated construction magnitude is between $100,000 and $250,000, with prevailing wage rates required. The procurement is 100% set-aside for small business under NAICS 236220 (size standard $45 million), and payment protection may be via a payment bond or irrevocable letter of credit.
Links (4)
Attachments (12)
Data sourced from SAM.gov.
View Official Posting »