DTA Manned/Unmanned Tactical Vehicle Lab
W912QR25R0052
This project is for the design, bid, and build construction of a non-standard, single-story research and testing facility for ground transport equipment. The building will be approximately 31,800 square feet, featuring a high bay over test areas and a lower bay over office and support spaces. The scope includes specialized foundations, vehicle parking, site development, and all necessary utility and system connections. The proposal due date remains 11 July 2025. The performance location is not specified, and no budget information is provided.