Fort Buchanan Microgrid
This is a Design-Bid-Build construction project to install an 8 MW diesel generator microgrid with an optional 4 MWh battery storage system at Fort Buchanan, including a microgrid control system, twelve 12,000-gallon ballistic-resistant fuel tanks, and integration of existing solar and wind generation. The contract duration is 1,141 calendar days from Notice to Proceed. The project is a Firm-Fixed-Price contract set aside for General Small Businesses, with a size limitation of $45,000,000. Performance of services will occur at Fort Buchanan. The microgrid will support energy resiliency by providing on-site generation and requires utility interconnection approval from LUMA.