Fort Buchanan Microgrid
This is a Design-Bid-Build Construction project to install an approximately 8 MW microgrid with new diesel generators, a 4 MWh battery storage option, and a full control system at Fort Buchanan, integrating existing solar and wind power. The work includes installing twelve 12,000-gallon fuel tanks and all necessary site work, commissioning, and electrical modifications. The contract has a performance period of 1,141 calendar days from the Notice to Proceed. It is a Firm-Fixed-Price contract with a size limitation of $45,000,000. This acquisition is set aside for General Small Businesses.