Inactive
Notice ID:W912PM22R0002
This is a Request for Information only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. We intend to Sol...
This is a Request for Information only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. We intend to Sole Source this requirement under Authority 10 USC 2304 (c)(1), as implemented by FAR 6.302-1(a)(2). The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct a Microgrid System. The scope of work includes: The US Army Corps of Engineers, Wilmington District is planning a sole-source action to for a new Firm Fixed Price (FFP) contract utilizing the design-bid-build method, under solicitation W912PM22R0002 for construction of the electric microgrid system for emergency power to the Joint Special Operations Command (JSOC) compound within Fort Bragg North Carolina. A new microgrid system will be installed capable of islanding the JSOC compound from the Fort Bragg distribution system. The microgrid system will fully support the JSOC compound, including all critical loads. The microgrid will include a master microgrid controller, diesel generation, switchgear, transformers, and automatic transfer switches. The procurement will include utility upgrades for supported facilities, erosion control measures, utility relocations, site improvement and demolition as required. This system will independently support the power needs of JSOC in the event of a power loss, allowing for unbroken support to the JSOC’s 24/7 worldwide operational tempo for up to 14 days of continuous operation. *See attached RFI for details*