Yuma Proving Ground (YPG) Vertical Wind Tunnel (VWT) Chiller and Control System Modernization
The U.S. Army Corps of Engineers, Los Angeles District, is conducting market research for the design-build replacement of a chiller and control system for a Vertical Wind Tunnel at Yuma Proving Ground, Arizona. The project has an estimated construction magnitude between $1,000,000 and $5,000,000 and an anticipated performance period of 730 days. The scope requires a complete design-build solution, including new chillers and a control system that must integrate with the existing proprietary iFly flight control system. The notice indicates the requirement will involve Controlled Unclassified Information and likely require Cybersecurity Maturity Model Certification (CMMC) Level 2 compliance. This is for planning purposes only and does not constitute a solicitation or commitment to award a contract.