Hangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona

Notice ID:W912PL26RA001

This project involves constructing a two-bay aircraft hangar with supporting facilities, including a fleet service terminal, airfield pavements, and demolition of two existing buildings. The performance period is 730 calendar days after receipt of the Notice to Proceed. The estimated construction cost is between $75,000,000 and $125,000,000. The location for performance is not specified in the description. The contract will be a firm-fixed-price, best-value procurement with full and open competition, requiring a project labor agreement.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W075 ENDIST LOS ANGELES
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Draft RFP for Industry Comments - Hangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona

Notice ID:W912PL26RA001

This project involves constructing a two-bay aircraft hangar with supporting facilities, including a fleet service terminal, airfield pavements, and demolition of two existing buildings. The estimated budget is between $75,000,000 and $125,000,000, with a performance period of 730 calendar days after receiving the Notice to Proceed. The location for performance is not specified in the description. A firm-fixed-price design-bid-build contract will be awarded through full and open competition, requiring a project labor agreement. The procurement is not set aside for small business and uses a best value trade-off evaluation method.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W075 ENDIST LOS ANGELES
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Hangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona

Notice ID:W912PL26RA001

This project involves constructing a two-bay aircraft hangar with supporting facilities, including a fleet service terminal, airfield pavements, and demolition of two existing buildings. The estimated budget is between $75,000,000 and $125,000,000, with a performance period of 730 calendar days after receipt of the Notice to Proceed. The location for performance is not specified in the description. A firm-fixed-price design-bid-build contract will be awarded through a best value trade-off process, and a project labor agreement is required. This procurement is full and open competition, not set aside for small business.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W075 ENDIST LOS ANGELES
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Draft RFP for Industry Comments - Hangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona

Notice ID:W912PL26RA001

The U.S. Army Corps of Engineers is releasing a draft RFP for industry comment for the Design-Bid-Build construction of a Hangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona. The project has an estimated budget between $50 million and $150 million. The estimated period of performance is 730 calendar days from the Notice to Proceed. This is solely a request for feedback on the draft documents, and no contract will be awarded from this notice. Comments must be submitted via email by 27 March 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W075 ENDIST LOS ANGELES
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

MC-130J Hangar/Aircraft Maintenance Unit

Inactive
Notice ID:W912PL26RA001

This is a SOURCES SOUGHT NOTICE for information only. Replies by interested parties will be used by this agency for preliminary planning purposes. No proposal or contract will be awarded from this not...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W075 ENDIST LOS ANGELES
  PSC   CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »