NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
The project involves repairs to a shore-connected, rubble-mound breakwater protecting King Harbor in Redondo Beach, Los Angeles County, California. The work consists of resetting existing armor stone and placing approximately 8,000 tons of new 14-ton armor stone to restore design elevations and slopes. The estimated budget for the project is between $5,000,000 and $10,000,000. The total estimated contract duration is 210 calendar days. The solicitation will be issued as an Unrestricted Sealed Bid and will be available electronically through the PIEE system.