MSD Infrastructure Repairs Phase 2
The U.S. Army Corps of Engineers, St. Louis District, proposes to provide federal construction assistance to the Metropolitan St. Louis Sewer District for combined sewer rehabilitation using Cured-In-Place Pipe (CIPP) methods. The contractor will furnish all labor, equipment, supervision, supplies, and materials to rehabilitate approximately 2,675 linear feet of sewers, ranging from 21 to 24 inches in diameter. The work will be performed at various sites within the MSD boundaries, including the City of St. Louis and St. Louis County, Missouri, with initial work located in MSD Service Area 1.