Work shall consist of furnishing all necessary labor, equipment, materials, and supplies required to dismantle and haul off site all wood decks, pre-fabricated trailers and utility poles from the form...
Work shall consist of furnishing all necessary labor, equipment, materials, and supplies required to dismantle and haul off site all wood decks, pre-fabricated trailers and utility poles from the former US Army Corps of Engineers FUSRAP Latty compound located at 8945 Latty Ave Berkeley, MO 63134. The abandoned FUSRAP Latty Ave compound was a radiological cleanup site. All trailers, wood structures and equipment have been surveyed and cleared of any radiological hazards for removal offsite. Site visit will be scheduled for 1:00pm on 4 November 2020 at 8945 Latty Ave Berkley, MO 63134.