Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912P919T0045
SITE VISIT WILL BE HELD THURSDAY, AUGUST 1st AT 10 AM CST at U.S. Army Corps of Engineers, Lake Shelbyville Visitor’s Center, 1989 IL-16, Shelbyville, IL 62565. Please contact Matt Miller (217-774-395...
SITE VISIT WILL BE HELD THURSDAY, AUGUST 1st AT 10 AM CST at U.S. Army Corps of Engineers, Lake Shelbyville Visitor’s Center, 1989 IL-16, Shelbyville, IL 62565. Please contact Matt Miller (217-774-3951 Ext. 7011) to confirm attendance for planning purposes. *SEE STATEMENT OF WORK IN SOLICITATION* The Contractor shall furnish all labor, equipment, and supplies necessary for the removal and replacement of the conduit system on the west spillway at Lake Shelbyville Dam. Locations for conduit system replacements and additional details can be found in Section 2 and Appendix A. This service will also include the replacement of all cabling starting from the west gallery RMU to the multiplexer junction box and from the multiplexer junction box to each surge protection board. All cabling will be previously disconnected from the power source by the Government. A new grounding system will also be installed as shown on the drawings and listed in these specifications. Major items of work included in this service include: · Removal and disposal of existing conduit system including all mounting hardware, cabling, junction boxes, and concrete pedestal. · Supply and installation of conduit, junction boxes, surge protection boards, grounding system, and wiring including connection to surge protection boards and labeling as required. Supply and installation of concrete pad and enclosure to house surge protection boards. · Supply of ADAS equipment for new instrumentation system. REPOST! Posted on July 25, 2019 as W912P918T0045 instead of W912P919T0045 by accident.