Lake Pontchartrain Tributaries, Tchefuncte River Bar Channel, Maintenance Dredging, St. Tammany Parish, Louisiana ED 26-009
This unrestricted procurement (NAICS 237990) involves maintenance dredging of the Tchefuncte River Bar Channel, with disposal of dredged material in open water areas along the Lake Pontchartrain shoreline; no dike work is required. The estimated construction magnitude is between $1,000,000 and $5,000,000. The estimated completion time is 56 calendar days after receipt of Notice to Proceed. The solicitation includes 15 drawings and specifications. The solicitation was amended on 8 September 2026 to incorporate changes to the bid schedule, plans, specifications, and drawings.