Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025
This unrestricted solicitation involves dredging and disposing of material from the Freshwater Bayou Channel, with all dredged material to be deposited on the Gulf shoreline west of the channel. The estimated construction cost is between $10,000,000 and $25,000,000. Performance will take place along the specified channel limits in the Freshwater Bayou area. No submission or bid timelines are provided in this description.