Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-1, ED 25-018
This unrestricted solicitation involves maintenance dredging of the Freshwater Bayou Channel, requiring removal and disposal of material above a specified elevation. The estimated construction cost is between $10,000,000 and $25,000,000. All dredged material must be transported and deposited on the Gulf shoreline west of the channel. Performance of services is located along the Freshwater Bayou Channel from mile 1.3 to mile -4.0. The non-bid timeline includes a contractor question response date of 15 July 2026.