The work consists of placement of precast concrete piles; placement of precast concrete floor and ramp framing; placement of a pre-engineered metal building; miscellaneous metal work, establishment of...
The work consists of placement of precast concrete piles; placement of precast concrete floor and ramp framing; placement of a pre-engineered metal building; miscellaneous metal work, establishment of turf; and other related incidental work. **************************************************** 05/16/24 - Amendment 0001 provides Q&A submitted by the established deadline. **************************************************** 05/23/24 - Abstract of Bids published